An at least medium-rated Green Space Certificate is required for the occupancy permit of the investment or, in the case of a landscape architecture work, for its technical handover.
The purpose of certification is to ensure that larger public and private investments (with a total useful floor area of 5000 m2 or more) and landscape architecture works exceeding 5000 m2 in area are provided with green spaces of adequate quality and quantity.
Improving the quality of landscape architecture works implemented on their own or as part of construction investments.
An at least medium-rated Green Space Certificate is required for the occupancy permit of the investment or, in the case of a landscape architecture work, for its technical handover.
The purpose of certification is to ensure that larger public and private investments (with a total useful floor area of 5000 m2 or more) and landscape architecture works exceeding 5000 m2 in area are provided with green spaces of adequate quality and quantity. Improving the quality of landscape architecture works implemented on their own or as part of construction investments.
Green space certification is mandatory for the following developments affecting plots with a total useful floor area exceeding 5000 m2
Landscape architecture works exceeding 5000 m2 in area
Construction investments
Buildings with an eaves height exceeding 65 metres
State building construction investments
Priority investments
Investments implemented in brownfield action areas
Anyone may request a voluntary Green Space Certificate
if they would like to learn the value of the green spaces on their plot and their CO2 sequestration capacity, obtain a point-cloud survey, and receive site-specific recommendations on the design and optimal maintenance of the green spaces.
Having a voluntary certificate prepared does not mean that, in order to obtain the occupancy permit or the certificate of completion, the “C” rating has to be met.
For the investments listed in the previous point, the Green Space Certificate does not need to be prepared if:
For new investments, a preliminary green space certification can already be requested at the design stage, in order to ensure that the Green Space Certificate achieves the appropriate rating.
In this case, by examining the landscape architecture plan prepared for the plot, the green space certifier determines whether the green space created according to the plan will allow the plot to meet the certification level required for the occupancy permit or the technical handover.
To have a preliminary certification prepared, the client (the developer or their representative) registers on the website and creates an order, which becomes active once the system usage fee has been paid.
The landscape architecture plan must be uploaded to the dedicated area of the website, which becomes available after registration.
Legal background
Green space certification is regulated by Government Decree 282/2024. (IX. 30.) on urban green infrastructure, the Green Space Certificate and the green trademark.
Ordering process
Survey & Assessment
Issuing the certificates
The request must be submitted before the completion of the green space construction works, at least 91 days in advance! The certifier must be selected and contracted within this period.
1. Registration
As the first step of certification, the client (developer, investor, contractor…) registers on the zoldfeluletitanusitvany.hu website and creates an order, which becomes active once the system usage fee has been paid.
The client assigns the details of the investment to the order, together with the planned completion date of the landscaping and green space works, which can be modified if the works do not progress according to schedule.
The date for the technical handover or for submitting the application for the occupancy permit can be set no earlier than the 20th day after the planned completion of the green space works.
2. Selecting the certifier
Based on the location of the order, the system suggests certifiers operating near the given plot, but the client is free to choose from the register of certifiers.
The selected certifier is notified of the order by e-mail and can accept or reject it in the system.
The client signs a contract with the certifier no later than the completion of the construction works. For this purpose, the system offers model contracts to the client.
3. Geospatial survey
Before certification, a geospatial survey is carried out on the plot, of which both the client and the certifier are notified in advance by e-mail.
The first notification arrives 90 days before the geospatial survey is due. Based on this, the client can accept the proposed date or reschedule it to a later date.
The second notification is a reminder that arrives one week before the survey. At the same time, the certifier can already start the preliminary data collection (review of the regulations applicable to the plot and of the design manual, if any, and of the data provided by the client: architectural and landscape architecture plans).
In the case of preliminary certification, no geospatial survey is carried out; the certification parameters are determined on the basis of the design documentation. At the client's request, a geospatial survey of the pre-design condition can be ordered if they would also like to know the exact biological activity of the existing condition, or would like to obtain a point-cloud survey of the property.